Preparation of hydromechanical arrangements and basic and final designs and budget for the expansion of the Sewage Treatment Station of Peixinhos - PE
The Sewage Treatment Station designs will be carried out for BRK Ambiental, considering the possibility of phasing for the implementation of the units (modulation), and final disposal of sewage from the Peixinhos Sanitary Sewage System, aiming at its universalization at the end of the last stage. General data provided for Sewage Treatment Station of Peixinhos, which will be built in four stages:
Maximum Flow at the end of the 4th stage: 1,293.00 L/s;
Final population served: 583,150 inhabitants.